Oil & Gas: Current Projects


Asian Gaspipeline Project. Line C (0 – 654 km) Scope of Work and Specifications:

Client: Asian Gas Pipeline LLP Construction of Pipeline

Period: 2013 - 2014

  • 644km from Uzbekistan border to be laid in parallel with lines A/B
  • 48” dia.
  • 9.81 Mpa design pressure
  • 25 BCMA transport capacity
  • 33 block valves
  • 4 pig traps
CPC Expansion project. Construction of pipeline at 116 – 204km & Construction (and Procurement) of the Pump Stations in the Republic of Kazakhstan Scope of Work and Specifications:
CPC Expansion project. Construction of pipeline at 116 – 204km & Construction (and Procurement) of the Pump Stations in the Republic of Kazakhstan

Client: Caspian Pipeline Consortium - K JSC
Expansion of Oil Pipeline Capacity

Period: 2011 - 2015

  • 88 kms
  • 40” dia.
  • 4 pump stations
Construction of Deep OIL Refining Complex at Atyrau Refinery Plant Scope of Work and Specifications:
Construction of Deep OIL Refining Complex at Atyrau Refinery Plant

Client: Atyrau Oil Refinery Plant LLP

Period: 2011 - 2016

  • Sulfur Recovery
  • SGP
  • Process and thermal power pipe network
  • Gasoline product tank farms
  • Diesel tank farms
  • Methanol unloading facility
  • Light oil loading facility
  • LPG tank farms
  • Roads and railway
  • Cooling water system
  • Waste water treatment system
  • Admin building
Construction of Aromatic Hydrocarbons Complex at the Atyrau Refinery Scope of Work and Specifications:
Construction of Aromatic Hydrocarbons Complex at the Atyrau Refinery

Client: SINOPEC Engineering Complex for Benzene Production

Period: 2010 - 2014

  • Nitrogen production unit
  • Catalytic reforming unit
  • Industrial Park reformate
  • Commercial reservoirs benzene
  • Storage Node N-formilmorfolina
  • Landfills for the disposal and recycling of oiled soils
  • Operator complex
  • Warehouse catalysts and adsorbents
  • Administrative buildings
  • External power supply systems
  • Chemical water treatment unit
  • Loading dock with a vapor recovery system
  • Commodity Pumpingstation
  • Fire-fighting system
Up-gradation of Konaban GGS and Pipeline Grid Project (Ukon_PGP) of Tripura Asset Scope of Work and Specifications:
Up-gradation of Konaban GGS and Pipeline Grid Project (Ukon_PGP) of Tripura Asset

Client: Oil & Natural Gas Corporation Limited

Period: 2010 - 2014

  • Design, Engineering, procurement, supply, fabrication, transportation, installation / erection, hookup, hydrotest, pre-commissioning & Commissioning of the facilities and gas pipelines as per the given details
  • 20” – 53 KM – Laying / installation of the Gas Pipeline from AGT (Agartala Dome) to OTPC power plant at Palatana including SV stations via Nimbutali and Bagabasa.
  • 16” – 12 KM – Laying / installation of the Gas Pipeline from Konaban GGS to Nimbutali.
  • 16” – 21 KM – Laying / installation of the Gas pipeline from Sonamura GGS to OTPC power plant at Palatana via Bagabasa.
  • 8” & 6” – 19.5 KM – Laying / installation of the Gas pipeline from Kunjaban to AGT GGS with manifold.
  • 8” & 6” – 12.5 KM – Laying / installation of the Gas pipeline from Sundalbari to Sonamura GGS with manifold.
  • Up gradation of Konaban GGS and Metering facilities at Palatana.
  • The work includes Installation of pipeline and related piping works at all seven Installations, SV Stations (06 Nos), Tap-offs and all associated mechanical, civil, structural, architectural, electrical, telecom and instrumentation works
Bozoy – Shymkent Gas Pipeline Construction Scope of Work and Specifications:
Beineu – Bozoy – Shymkent Gas Pipeline Construction (882.6 – 1454.2 km)

Client: Bozoy – Shymkent Gas Pipeline LLP

Period: 2012 - 2015

  • 882.6 – 1454.2 km
  • 311km from Beineu to Bozoi
  • 42” dia.
  • 19 block valve stations
  • 3 pig trap stations
  • 7 helipads
Construction of PS No8. II Stage of 2nd Phase of Kazakhstan – China Oil Pipeline Construction Scope of Work and Specifications:

Client: Kazakhstan-China Pipeline LLP Procurement and Construction of Pump Station №8

Period: 2012 - 2014

  • Extention of substation PS500kV «Kegoc» in Agadyr station
  • Procurement and construction high voltage line 35kV – length 25km
  • SCADA system
15 MMTPA Greenfield Refinery, Paradip Refinery Project Scope of Work and Specifications:

Client: Indian Oil Corporation Limited Greenfield Refinery

Period: 2011 - 2014

  • Piles - 15,000
  • RCC - 3,33,000 M3
  • Structural Steel - 45,000 MT
  • Piping - 16,50,000 inch-dia
  • Cable works - 1,200 km among others
Laying Of Pipeline & Associated Works Of Rewari Kanpur Pipeline Project Scope of Work and Specifications:
Laying Of Pipeline & Associated Works Of Rewari Kanpur Pipeline Project

Client: HPCL

Period: 2013 - 2015

  • Pipeline laying and associated work for onshore multi product petroleum pipeline of 457 mm OD (18”), 441 Km long including 11 SV & IP.
Paradip Refinery Project ( AVU Fired Heaters, NHT CCR Heaters, VGO - HDT Unit ), Paradip Scope of Work and Specifications:
Paradip Refinery Project  ( AVU Fired Heaters , NHT CCR Heaters, VGO - HDT Unit ), Paradip

Client: Indian Oil Corporation Limited

  • Residual Process Outline Design, Detailed Engineering, Site Survey, Procurement, Supply, Fabrication, Inspection by Third Party Inspection Agency (TPIA) as applicable, Transportation of all Equipment Material to work site, Storage, Materials Management, Construction, Assembly and Installation, obtaining all necessary Statutory Approvals, Testing, Pre-Commissioning, Assistance with Commissioning, Start-up and Performance Guarantee Test Run (PGTR) Including Total Project Management and Handing Over of Complete AVU Fired Heaters, NHT CCR Heaters, VGO - HDT Unit on a Single Point responsibility basis for Paradip Refinery Project, Paradip, Orissa
Dabhol Bangalore Gas Pipeline Construction Scope of Work and Specifications:

Client: Gail (India) Limited
PMC: Engineers India Limited

Period: 2010 - 2014

  • The work includes Installation of Pipeline and related piping and barrels works at IP &RT terminal, SV Stations, Tap-offs and all associated mechanical, civil, structural, architectural, electrical, telecom and instrumentation works.

$1.5 Billion
Revenue
25000
Workforce
$2 Billion
Order Backlog
$375 Million
Equipment
17
Nationalities
10
Countries