Oil & Gas: Completed Projects


TCO Future Growth Project /Third Generation Injection Project (FGP/ 3GI)/ Contract No.: CW1520037, Kazakhstan Scope of Work and Specifications:

Client: Tengiz Chevroil LLP

Period: 2017-2019

  • Civil Works and Underground piping at 3GI site
CAC-4 gas-main pipeline. Construction of new sections of the looping. Scope of Work and Specifications:

Client: IntergasCentralAsia JSC Construction of Pipeline

Period: 2005 - 2007

  • 255km from Alexander Guy to Inder
  • 56” dia.
  • 6 compressor stations
  • 800m HDD river crossing
  • SCADA installation works
Turnkey construction of facilities for associated gas utilization at Kozhasay and Alibekmola fields Scope of Work and Specifications:

Client: KazakhOilAktobe LLP Development

Period: 2009 - 2014

  • 8 inlet compressors
  • 2 export compressors
  • Gas dehydration unit
  • Fuel gas preparation unit
  • Amine gas sweetening unit
  • Alkali treatment unit
  • Sulphur recovery unit with palletizing unit
  • Low temperature condensation unit
  • Propane refrigeration unit
  • Gas fractionation unit
  • Export compression unit
  • Product storage (LPG, SNG and sulphur)
  • Electrical & control systems
  • Utilities
Construction of Atasu – Alashankou main gas pipeline Scope of Work and Specifications:
Atasu - Alashankou main gas pipeline

Client: Kazakhstan-China Pipeline LLP Construction of Pipeline

Period: 2004 - 2007

  • 592km
  • 32” dia.
  • pig trap stations
  • block valve stations
  • river crossings
  • access & service roads
  • power lines
I stage of 2nd phase of of Kazakhstan – China oil pipeline construction. “Kenkiyak – Kumkol” project Scope of Work and Specifications:

Client: Kazakhstan-China Pipeline LLP Construction of Pipeline

Period: 2008 - 2010

  • 483km
  • 32” dia.
  • block valve stations
  • emergency power supply
  • pig trap stations
  • emergency repair & metering stations
  • telecommunication system
AGP Compressor Station #2 Scope of Work and Specifications:

Client: Asian Gas Pipeline LLP Construction of Compressor Station

Period: 2009 - 2012

  • 3 gas compressor units
  • air coolers
  • filter separators 10.3MPa
  • fuel gas unit
  • power station
  • CS control system
  • associated facilities & E&I
AGP Compressor Station #7 Scope of Work and Specifications:

Client: Asian Gas Pipeline LLP Construction of Compression Station

Period: 2009 - 2012

  • 4 gas compressor units
  • air coolers
  • filter separators 10.3MPa
  • fuel gas unit
  • power station
  • CS control system
  • associated facilities & E&I
Sulphur recovery unit for Guru Gobind Singh Refinery Scope of Work:

Client: HPCL-Mittal Energy Limited
PMC: Engineers India Ltd.
Entity: KSS Petron

Period: 2008 - 2012

  • Scope of Work of the Project included Finalization of Process Licensor for SRU / TGTU Units, Detailed Design & Engineering, Project Management & Planning, Procurement & Supply, Inspection & Expediting, Construction & Mechanical Completion, Pre Commissioning & Commissioning, Performance Guarantee Test Run & handing over of the Plant.
Development of Nuraly field Scope of Work and Specifications:

Client: KazGerMunai LLP Development

Period: 2008 - 2009

  • Modular booster and group pump stations
  • Water separation unit
  • Water tanks
  • Sump tanks
  • Water conduits
  • Oil gathering system
  • Pump station
  • Separators
  • Oil dewatering and desalting unit
  • Water pipelines
  • Oil treatment unit
  • Tank farm
  • 32km gas pipeline 219mm dia
Extension of Gas Treatment Plant at Akshabulak field Scope of Work and Specifications:

Client: KazGerMunai LLP Development

Period: 2008 - 2011

  • Modular compressor unit with coolers
  • Separation unit
  • Debutanization and deethanization units
  • LPG cooler unit
  • Glycol regeneration unit
  • Electrical & Control systems
  • Utilities
Construction of main oil pipeline for Chinarevskoe oil-gas condensate field (COGCF) – Rostoshi Scope of Work and Specifications:
Construction of main oil pipeline for Chinarevskoe oil-gas condensate field (COGCF) – Rostoshi

Client: «Zhaikmunay» LLP Pipeline

Period: 2006 - 

  • Linear part of oil pipeline «COGCF - Rostoshi»
  • MOTS site
  • 10 kW HV power line with 120 km extension
  • Fiber-optic process communication cable with 120 km extension
  • Cathodic Protection Stations sites — 14 items
  • Stop valve sites — 12 items
Construction of export pipeline within Experimental Development Program for Kashagan field Scope of Work and Specifications:
Construction of export pipeline within Experimental Development Program for Kashagan field

Client: Agip KCO

Period: 2008 - 2011

  • Design engineering
  • Construction, Assembling and testing of aboveground export oil pipeline system and auxiliary equipment
Bina – Kota oil pipeline construction Construction of Pipeline

Client: Bharat Petroleum Corporation LTD

Period: 2009 - 2011

  • 257km
  • 18” dia.
Barmer – Salaya oil pipeline construction Scope of Work and Specifications:

Client: Cairn Energy / L&T Construction of Pipeline

Period: 2009 - 2010

  • 55km
  • 24” dia. with 8” dia. pipe for heat tracing for high wax crude oil
Capital repair (replacement) of Kalamkas – Karazhanbas – Aktau oil pipeline insulation at 0 – 62 km (selectively) Scope of Work and Specifications:
Capital repair (replacement) of Kalamkas – Karazhanbas – Aktau oil pipeline insulation at 0 – 62 km

Client: KazTransOil JSC Capital repair (replacement)

Period: 2006

 
Chennai Bangalore pipeline project Scope of Work and Specifications:

Client: Indian Oil Corporation Limited

Period: 2009 - 2010

Laying of 290 Kms of Cross Country Petroleum product Pipeline including installation of Pipeline across creek/canal Crossings through Horizontal Directional Drilling (HDD) technique and associated facilities.

The total works has been executed into two groups:

  • Group A: From CPCL, Manali (0.00 Km) to Intermediate Scrapper Station at Chittoor ( 147.00) – 14”OD X 147 Kms
  • Group B: From Intermediate Scrapper Station at Chittoor (147.00 Km) to Devangonthi (290.00)– 12.75”OD X 143Kms
Water & Fuel Gas Pipeline of Integrated Petrochemical Complex in Atyrau region (KPI) Scope of Work and Specifications:
Water & Fuel Gas Pipeline of Integrated Petrochemical Complex in Atyrau region (KPI)

Client: Kazakhstan Petrochemical Industries Inc. LLP

Period: 2010 - 2012

 

$1.5 Billion
Revenue
25000
Workforce
$2 Billion
Order Backlog
$375 Million
Equipment
17
Nationalities
10
Countries