Gas pipeline 20"- 147 km from Uralsk to Aksay on EPC terms with 10 main crossings, 25 valve positions, 5 gas distribution stations, 2 double-sided pig traps and SCADA installation works
Activity Area: Oil and gas industry
Client: KPO
Country: Kazakhstan
Date of completion: 30.04.2012
Construction period: 52 months
Project description
Pipe size/length: L 20 inches (508 mm) -147 km.Contact us