280, Baizakov Street, Almaty

Gas pipeline 20"- 147 km from Uralsk to Aksay on EPC terms with 10 main crossings, 25 valve positions, 5 gas distribution stations, 2 double-sided pig traps and SCADA installation works

Activity Area: Oil and gas industry

Client: KPO

Country: Kazakhstan

Date of completion: 30.04.2012

Construction period: 52 months

Project description
Pipe size/length: L 20 inches (508 mm) -147 km.

Gas pipeline 20"- 147 km from Uralsk to Aksay on EPC terms with 10 main crossings, 25 valve positions, 5 gas distribution stations, 2 double-sided pig traps and SCADA installation works

1

Gas pipeline 20"- 147 km from Uralsk to Aksay on EPC terms with 10 main crossings, 25 valve positions, 5 gas distribution stations, 2 double-sided pig traps and SCADA installation works

2

Gas pipeline 20"- 147 km from Uralsk to Aksay on EPC terms with 10 main crossings, 25 valve positions, 5 gas distribution stations, 2 double-sided pig traps and SCADA installation works

3

KazStroy
Service

KazStroy
Service

KazStroy
Service

1

2

3

1 / 3
Back to the list

Contact us

We will promptly reply to your questions on design, procurement, industrial construction, etc.