Engineering of water barrier crossings, equipment supply, assembly, construction, commissioning on turnkey basis at pipeline linear part
Activity Area: Oil and gas industry
Client: Nostrum oil & gas (Zhaikmunai LLP)
Country: Kazakhstan
Date of completion: 31.03.2009
Construction period: 7 months
Project description
Main oil pumping unit and oil sump valve near the Rostoshi village. Pipe size/length: L 300 –107 km in mobilization state.